Home Services Service Areas Portfolio Reviews Blog Contact (800) 216-1005

Remodeling Contractor in Westwood, Los Angeles

High-rise condos on Wilshire, period homes on the single-family streets, and student buildings in the North Village. Three kinds of building, each with its own approval path.

✓ Licensed, Bonded & Insured · Lic #1008892
★ 50+ Five-Star Reviews
🏠 500+ Projects Since 2015
📄 Written Scope. Locked Price.

Westwood, Los Angeles 90024

What remodeling in Westwood actually involves

Westwood was laid out by the Janss Investment Company on the former Wolfskill Ranch starting in 1922, ahead of UCLA opening its Westwood campus in 1929. The single-family streets north and south of Wilshire still hold many homes from those first decades, Spanish Colonial Revival, Tudor and traditional houses from the 1920s and 1930s, alongside later rebuilds. Part of Holmby Hills, south of Sunset and east of Beverly Glen Boulevard and Comstock Avenue, also falls within Westwood.

The other half of Westwood is vertical. Wilshire Boulevard is lined with condominium towers, the North Village west of Gayley Avenue is mostly multifamily housing for UCLA students, and apartment and condo buildings run along Westwood Boulevard. A Westwood remodel can be a period house where the job is protecting original detail, or a high-floor condo where the job is working within the building rules. We scope for the one you own.

Get a Free Estimate →
Remodeling work by New Cali Construction

Where we work in Westwood

The Wilshire Corridor condo towers, the single-family streets around Westwood Village, the Westwood portion of Holmby Hills, North Village, and the blocks along Westwood Boulevard. ZIP codes 90024 and 90025.

Our Services

What we build in Westwood

Kitchen Remodeling by New Cali Construction

Kitchen Remodeling in Westwood

Period kitchens in 1920s and 1930s homes reworked without losing their character, and condo kitchens in Wilshire towers rebuilt inside the building's fixed plumbing stacks.

See kitchen remodeling →
Bathroom Remodeling by New Cali Construction

Bathroom Remodeling in Westwood

Primary and guest baths in period homes and high-rise condos, waterproofed and inspected so the unit below never becomes your problem.

See bathroom remodeling →
ADU and Garage Conversion by New Cali Construction

ADU & Garage Conversion in Westwood

Backyard ADUs and garage conversions on single-family lots, checked against setbacks, hillside rules and any private restrictions before design.

See adu & garage conversion →
Whole-Home Remodel by New Cali Construction

Whole-Home Remodel in Westwood

Whole-house renovations of Westwood period homes: seismic work, systems replacement, structure and finishes on one contract.

See whole-home remodel →
Condo and HOA Remodeling by New Cali Construction

High-Rise Condo Remodeling

Wilshire Corridor towers run their own approval process before the city sees your plans: board or management review, insurance certificates naming the association, freight elevator bookings, restricted work hours and protection of common areas. We prepare that package, then pull the LADBS permits the work still requires, and we do not order materials until both are in hand.

See how we work →

Permits & Local Rules

Who approves your project in Westwood

Westwood is part of the City of Los Angeles, so permits go through LADBS. In a condo tower the building's own approval comes first and is often stricter than the code. In single-family areas, the city's floor-area limits and any hillside designation on the parcel shape what an addition can be.

  • LADBS permits and inspections for structural, plumbing, electrical and mechanical work. Pulled in our name under License #1008892, never in yours.
  • Condo associations review before the city does. Plans, product specifications, insurance naming the association and an approved schedule usually have to be on file before work begins.
  • Single-family zones carry floor-area limits. The City of LA caps residential floor area on single-family lots, and some parcels add hillside rules. We confirm the buildable envelope on ZIMAS before anyone designs an addition.
  • Shared condo walls and floors are fire- and sound-rated. Cutting into them means restoring the rating, and inspectors check it closely.
  • Pre-1978 buildings require lead-safe work practices, which covers most period homes and many older apartment and condo buildings. We test before demolition begins.

Local Experience

Three things we plan for on every Westwood job

01

The building sets the schedule

In a Wilshire tower, the freight elevator, the loading dock and the approved work hours decide when material arrives and when noisy work can happen. We book those first and build the schedule around them, which keeps the job from stalling halfway with a building manager at the door.

02

Plaster, steel windows and original tile

Many Westwood period homes still have plaster walls, steel casement windows and decorative tile. Plaster is cut and patched differently from drywall, and steel windows can often be restored rather than replaced. We price the version that keeps them and show you the cost of the alternative.

03

Access near UCLA and the Village

Near the campus and Westwood Village, parking is scarce and streets fill at the start of each academic quarter. Deliveries, dumpster permits and crew parking are arranged in advance, and we schedule around the academic calendar where it affects access.

Transparent Pricing

Typical investment ranges

Every Westwood project gets its own written, line-item quote. These ranges are for planning.

Refresh

$15K - $40K

Single-room refresh: bathroom, kitchen facelift, or flooring throughout. Typically 2-4 weeks.

Renovate

$40K - $120K

Full kitchen, primary suite, or multi-room remodel with layout changes. Typically 4-10 weeks.

Transform

$120K - $500K+

Whole-home remodel or ADU build, design through final inspection. Typically 3-6 months.

Free estimates always. Every quote is line-item and locked in writing before work begins.

Recent Work

Craftsmanship you can look at

A sample of completed New Cali Construction projects across the Westside. See the full portfolio →

Completed remodel by New Cali Construction Completed remodel by New Cali Construction Completed remodel by New Cali Construction

Common Questions

Westwood FAQs

Do I need HOA approval to remodel a Westwood condo?

Almost always. Wilshire Corridor and other Westwood condo buildings typically require plan review by the board or management, a contractor certificate of insurance naming the association, approved work hours and elevator bookings. LADBS permits still apply to plumbing, electrical and structural work. We prepare the association package and handle the city permits.

Who issues building permits in Westwood?

The City of Los Angeles, through LADBS. Westwood is a Los Angeles neighborhood, with addresses mostly in ZIP code 90024 and some blocks to the south in 90025. New Cali Construction pulls permits and schedules inspections under License #1008892.

Can I add on to my Westwood house?

Often, within limits. The City of LA caps floor area on single-family lots, and parcels with a hillside designation have extra rules. Private deed restrictions can apply in some tracts too. We confirm the buildable envelope for your parcel before you commission a design.

How much does a Westwood condo remodel cost?

A guest bathroom generally runs $15,000 to $35,000 and a full kitchen between $40,000 and $120,000. High-rise work adds logistics cost, such as elevator time, protection of common areas and restricted hours, and that cost is itemized in the scope rather than added later.

Remodeling in Westwood? House or tower, we plan for both.

Free in-home consultation. Written line-item scope. Locked price before we start.

We also work nearby

Get in Touch

Get a Free Westwood Estimate

Free in-home consultation, a written line-item scope, and a locked price. No pressure, ever.

👈